— training miles since June 1 · the 10,000 start Jan 1

Alto Velo Joy Ride

Palo Alto, CA · Road

When
Second Saturday of the month, 9:20 amYear-round
Starts at
Summit Bicycles, 392 California Ave, Palo Alto, CA 94306 Map ↗
Distance
40–45 miles
Pace
slower than the club C rideNo-drop: nobody gets left
Next ride
Hosted by
Alto Velo Racing ClubClub
Kind of ride
Road
Map of California with this ride's start
Palo Alto, CAAll rides near Palo Alto →
First time on this ride? Here’s the drill
Bring
a helmet, water, a spare tube or patch kit, a way to pay for the stop.
Arrive
Ten or fifteen minutes before the meet time. Tell whoever's leading that you're new.
Pace
Slower than the club C ride. It's no-drop: if you fall off the back, someone waits. That's the point of a group ride.
Check
Look at the host's website the day of — that's where cancellations, weather calls and start changes get posted.

About the Alto Velo Joy Ride group ride

Alto Velo Joy Ride is a road group ride in Palo Alto, CA. It rolls second Saturday of the month at 9:20 am from Summit Bicycles.

A no-drop club ride at a slower pace than the C ride, 40 to 45 miles, on the second Saturday of the month. Gather at Summit Bicycles on California Avenue at 9:00 and roll at 9:20. The Sept 12 ride was posted on 9/9/26.

Checked Oct 1, 2026 against source 1. Schedules change. Confirm with the host before you go.

Rode it, run it, or something's wrong? Tell us
What is this about?

← Find another group ride

I do the miles. You decide who they’re for.

In 2027 I ride 10,000 miles, all on the bike, every one of them for queer communities. You pledge a few cents a mile and pick which org it goes to. It starts January 1.